Construction Update #4

Mar 13, 2020

Construction is full steam ahead at St. Charles Market during this busy winter season. The exterior walls of all 8 levels are nearing completion, with PH Level 8 constructed of steel and glass in progress now. The signature starry night wall windows have been installed, as well as the windows and exterior sliding doors in the balance of the condos. Terracotta that makes up the exterior facade is being installed in a beautiful and complex pattern that mimics the tall lines of the stained glass windows of the church.  

Inside, plumbing has been installed and walls are framed. Electrical work is nearing completion as we work our way up to level 6, then the penthouses. Drywall on lower levels has begun. Overall, construction is progressing as planned and we are excited for residents to begin moving in starting in late spring and continuing throughout the summer!  

Only 5 Units remain with a limited time to select finishes. Stay tuned for more photos and updates as we move forward with interior finishes in the coming months.

 

We’re nearly dried-in. Level 8 glass is en route. We love how PH Levels 7 & 8 are stepped back to enhance curb appeal and provide privacy for residents.

 

 A blend of smooth and ribbed terracotta panels are complemented by copper coloured window frames.

 

The automated valet parking system with the on-site back-up generator is coming along nicely. Palettes are next.

 

Contact chantal@modbox.ca for a hard hat tour to see our last 5 units.